Information of the project
Partner: A leading logistics company with a large truck fleet
Goal: Replace incineration with advanced pyrolysis recycling
Solution: Recovery of carbon black, green hydrogen, and recycled steel
Impact: Significant reduction in CO₂ emissions and enhanced material reuse
Technical description
Wattage
340
Warranty
25 years guarantee
Operation temperature
-45°F to +185°F
Invert power
3.8 Kw / 7.6 Kw - 97.75% efficiency
Dimensions
68.5” x 40,5” x 1.57”
Frame type
Blavk anodized aluminum


